Bike path (Bothin Marsh)
Flooded, about 12 in or more
Avoid, take another route
Until about 11:45 am
Flooded, about 12 in or more
Avoid, take another route
Until about 11:45 am
Live forecast as of 7:38 am. It updates every 10 minutes.
The Mill Valley to Sausalito path floods through Bothin Marsh, between Almonte Blvd and the Coyote Creek bridges, when a high tide tops the marsh. People walking or biking reach the water's edge and have to turn back or wait.
Plan around it.
No official closure on record since Oct 1, 2026. That does not mean it stayed open: some closures are never posted.
The forecast follows NOAA's San Francisco tide gauge (9414290), near the Golden Gate. Water can show on the bike path from about 5.7 ft there, it is usually flooded from about 6.0 ft, and deep or likely closed from about 6.5 ft.
The water gets here about 15 minutes after the San Francisco gauge reaches that level, and drains about 60 minutes after it falls back below.
Rain, wind and storm drains can make it flood earlier and deeper. These are estimates: follow official closures and barricades.